Mighty Ships Season 6 Episode 6

Mighty Ships Season 6 Episode 6

Overview

Purpose-built to install the world’s most powerful wind turbines. Imagine a ship that can raise herself up 15 metres (5 storeys) out of the water to create a stable construction platform in the middle of the sea. Now add a 600-ton crane ready to reach high into the sky. That’s Neptune: brand-new, ready and willing to install the world’s heaviest and most powerful wind turbines on Belgium’s first offshore wind farm.

Episode Title: Neptune

Duration: 00:45 45min

Air Date: 2012-08-13

Year:

IMDb: 7.2

5101